Guinea 3000BPH Bottled Water Production Line Project
Factory Visit, Bottle Design Selection & Turnkey Water Bottling Solution
Project Overview
Location: Guinea
Year: 2026
Capacity: 3,000 Bottles Per Hour Fully Automatic Production Line (3000BPH)
Products: PET Bottled Drinking Water
Solution: Complete Turnkey Bottled Water Production Line
As bottled drinking water demand continues to grow across West Africa, our customer from Guinea planned to establish a reliable and cost-effective bottled water factory.
After several rounds of online discussions, the customer decided to visit the TINGS factory in China to inspect our manufacturing capabilities, equipment quality, and production processes before making the final investment decision.
The factory visit allowed both teams to communicate directly and optimize every detail of the project.
Factory Visit & Engineering Discussion
During the visit, our engineering team introduced the complete bottled water production process, including:
- Water treatment system
- PET bottle blowing system
- Bottle filling machine
- Labeling solution
- Packaging system
The customer carefully inspected the equipment, discussed future production plans with our engineers, and gained a deeper understanding of how each machine contributes to stable and efficient production.
This face-to-face communication helped ensure that the final production line would fully meet the customer’s business objectives.
Bottle Design Consultation
Choosing the right bottle is not only about appearance—it also affects production efficiency, labeling compatibility, transportation, and brand recognition.
During the factory visit, the customer reviewed different PET bottle samples displayed in our bottle design showroom.
Together, we discussed bottle shapes, capacities, neck finishes, and future branding considerations to help the customer select a practical and market-friendly bottle design for the Guinea market.
This consultation ensures that both the bottle and the production line work together efficiently from the beginning.
Why Global Hotels Choose TINGS
Rather than simply purchasing machines, the customer was looking for a long-term engineering partner capable of providing complete technical support.
TINGS delivered a turnkey solution covering equipment selection, bottle consultation, production planning, factory testing, and after-sales support.
By visiting our factory and working closely with our engineering team, the customer gained confidence in both the equipment quality and our commitment to long-term cooperation.
From Our Factory to Guinea
Following the successful factory visit, bottle design confirmation, and production testing, the project entered its final stage—shipment.
Our production and logistics teams carefully loaded the complete 3000BPH bottled water production line using forklifts and professional handling equipment. Every machine was inspected, secured, and prepared for international transportation before leaving our factory.
For us, shipment is more than the end of manufacturing—it is the beginning of our customer’s new bottled water business in Guinea. We look forward to seeing this production line successfully operating and supporting the growing demand for safe drinking water in West Africa.