+86 18823088993
tings87@jmtings.com
No.1 Jianghe Road, Duruan Town, Pengjiang District, Jiangmen City, Guangdong Province, China
+86 18823088993
tings87@jmtings.com
No.1 Jianghe Road, Duruan Town, Pengjiang District, Jiangmen City, Guangdong Province, China
In Cambodia’s growing bottled water market, product differentiation has become increasingly important for new investors.
This project was completed for a customer in Sihanoukville, Cambodia, who planned to establish a bottled drinking water business with a production capacity of 2,000 bottles per hour (BPH).
During the initial discussions, the customer was considering a standard purified water product. However, after detailed technical consultations with the TINGS engineering team, the project evolved into a mineral water production solution designed to provide additional value and stronger market positioning.
The customer wanted to enter the local bottled water market but needed guidance on:
As a first-time investor, the customer required not only equipment but also technical recommendations for developing a successful bottled water brand.
After evaluating the customer’s water source and project goals, TINGS proposed a customized mineral water production solution.
The system included:
The solution was designed to produce safe, consistent, and high-quality mineral water while maintaining efficient production capacity.
Through technical discussions with the customer, TINGS explained the advantages of producing mineral water rather than standard purified water.
Key benefits include:
By carefully controlling mineral content after purification, the customer was able to create a product that met local consumer preferences while maintaining consistent quality.
The customer provided production footage showing the complete operation process, including bottle filling, capping, conveying, labeling, and finished product output.
The video demonstrates the smooth operation and production efficiency of the mineral water bottling line.
Production Capacity: 2,000 Bottles Per Hour in 500ML&360ML
Location:Sihanoukville, Cambodia
Application:Mineral Water Production
Industry:Bottled Drinking Water Manufacturing
You will get a reply from our engineers within 24 hours with tailored advice.Don’t worry—your information stays private.